Sidewalks in front of Town Hall

The Town is working with MassDOT to replace the sidewalks along Hanover Street in front of the Town Hall where they cross the driveways to the Town Hall and Library.  The sidewalks have been stripped and will be paved by MassDOT when their contractor paves in front of Town Hall.  This is expected to happen early next week.  Motorists and pedestrians are urged to exercise caution when crossing these sidewalks.  Access to the library from the front of Town Hall may be blocked at times.  The library shall remain fully accessible through the back of Town Hall via the main Town Hall parking lot.