Middle School Floor Tile Project, Bid by 3/28
Hanover Middle School Floor Tile Replacement and Abatement Project.
DCAM certified resilient flooring company to follow the Project Design of phased abatement project.
Bid Documents will be available March 9 and bids are due on March 28. To get more information, go to: www.Projectdog.com and click ‘Sign Up’ for free, or login with an existing account. Enter Project Code ‘817751’ in the project locator box. Select ‘ Acquire Documents’ to download documents, review a hard copy at Projectdogs physical location, or request a free project CD. Questions regarding the website or project distribution should be directed to Projectdog at (978) 499-9014.